If lead paint is removed from a steel structure that is neither a bridge nor a storage structure, the owner or contractor shall:
apply a method of removal and containment according to parts 7025.0310 to 7025.0350, as if the structure were a storage structure;
if the steel structure is mobile, portable, or disassembled, conduct paint removal inside a building or an enclosed structure; or
21 SR 202
April 14, 2000
Official Publication of the State of Minnesota
Revisor of Statutes